Part of the Golden Eagle Energy Group network
INDEPENDENT THINKING. INTEGRATED ENERGY.
HONEST SOLAR.
COMMERCIAL ENERGY. CLEARLY EVALUATED.

Solar + EV Charging

Solar + commercial EV charging

Evaluate the overlap between daytime production and actual charging schedules.

Charging schedules govern the opportunity

Daytime workplace charging may align with solar generation. Overnight fleet charging does not have the same overlap. Planned charger capacity is not the same as actual utilization: vehicle dwell time, fleet operations and charging behavior determine load.

Service capacity and demand

Simultaneous charging can create substantial demand even when annual charging energy is modest. Review utility capacity, service equipment, load management and demand-charge treatment before choosing charger quantities or solar-system size.

  • Estimate utilization from operational requirements, not optimistic assumptions.
  • Coordinate network, payment and communications requirements.
  • Assess canopy geometry and electrical routing.
  • Compare managed charging with storage where the data supports it.

Test the combined business case

Solar, chargers, canopies and storage each have costs and operating obligations. Model them separately and together; a viable solar project does not establish a viable charging business.

A preliminary analysis is not an engineered design. Where licensed or authorized professional services are required, qualified professionals must perform them.

Research references

U.S. DOE — Solar Energy and Storage Basics ↗

Explore the related specialist in the Golden Eagle Energy Network ↗

Continue your evaluation

Compare the available information with your property's condition, operating data and actual tariff. Missing information may justify deferral rather than an equipment recommendation.

Understand Site Analysis