Ground-mounted commercial solar

Evaluate land, drainage, foundations and the distance to your electrical service.

Land has more than one use

Available land may also serve future development, circulation, stormwater management or operational storage. Evaluate opportunity cost and long-term property plans before dedicating space to generation. A concept layout must account for maintenance access, setbacks, shading and site constraints.

Civil work can govern viability

Grading, drainage, soils and foundation design determine more than construction cost. They influence runoff, equipment stability, access and long-term maintenance. Environmental constraints and jurisdictional permitting must be checked for the actual property.

  • Identify buried utilities and easements.
  • Assess electrical distance and trenching routes.
  • Review drainage and access for emergency and maintenance vehicles.
  • Confirm the applicable utility interconnection pathway.

Compare alternatives on consistent assumptions

Compare rooftop, canopy and ground-mounted options using the same consumption, tariff and financial assumptions. The largest capacity is not automatically the best use of capital or land.

A preliminary analysis is not an engineered design. Where licensed or authorized professional services are required, qualified professionals must perform them.

Research references

PVWatts: performance assumptions and uncertainty ↗

Continue your evaluation

Compare the available information with your property's condition, operating data and actual tariff. Missing information may justify deferral rather than an equipment recommendation.

Understand Site Analysis