Start with the roof, not the array
A large roof is an opportunity, not proof of suitability. Establish roof age, replacement plans, membrane condition, warranty requirements and drainage before planning equipment. Installing solar shortly before reroofing can create removal, storage and reinstallation costs that undermine the original economics.
- Confirm roof ownership and remaining service life.
- Document penetrations, drains, HVAC equipment and maintenance routes.
- Have qualified professionals assess structural capacity and site-specific loads.
Mounting and access
Ballasted systems use weight to hold equipment in place; attached systems connect to the roof structure. The appropriate choice depends on wind design, roof construction, loading and waterproofing requirements. Neither approach is universally preferable. Flat and sloped roofs need different layouts, and usable area is smaller than total roof area.
- Preserve fire access, setbacks and pathways required by the applicable authority.
- Coordinate mounting with the roof manufacturer and warranty provider.
- Provide access for cleaning, electrical maintenance and eventual roof work.
Coordinate electrical and operational constraints
Inverter locations, AC routing, metering and the interconnection point can materially affect cost. A proposal should explain how the array serves the building load, whether exports are expected and how future occupancy or operating changes affect value.
Research references
PVWatts: performance assumptions and uncertainty ↗Sources reviewed November 17, 2026. General engineering guidance is not a site-specific projection.
Continue your evaluation
Compare the available information with your property's condition, operating data and actual tariff. Missing information may justify deferral rather than an equipment recommendation.
Understand Site Analysis